Loading
  • 0Shopping Cart
SEC Interiors
  • Home
  • Fit Outs
    • Office Fit Outs
    • Communal Areas
    • Industrial Fit Outs
    • Office Mezzanine Floor
    • Office Receptions
    • Fit Out Products
      • Partition System
      • Commercial Lighting
      • Furniture
      • HVAC
      • Office Flooring
      • Staff WCs
      • Suspended Ceilings
  • Projects
  • Office Refurbishment Services
    • Cat A and Cat B
  • Office Design
  • About
    • Accreditations
    • Health & Safety
    • Meet the Team
    • Insights
  • Contact Us
  • SEC Group
    • The CleanRoom Company
    • SEC Storage
    • SEC Exports
  • Search
  • Menu Menu
  • Twitter
  • Facebook
  • LinkedIn
  • Instagram
  • Pinterest

Axalta Coating Systems (UK) Limited

Complete fit-out of new 2,106 square metre Academy including offices and training facilities.

Axalta Coating Systems (UK) Limited, originally DuPont Performance Coating; specialises in the production of liquid and powder coatings globally.

Location: Welwyn Garden City

Before

PreviousNext
123

After

PreviousNext
1234567

Key project features

2 Mezzanine floors
Air Conditioning
male and female changing rooms and WCs.
operable wall to divide

Project summary

Overview

Competitive design and build process, acting as a principle contractor and managing client’s specialist installation contractors.

The office fit-out project carried out at Axalta Coating Systems (UK) Ltd included a 140 metre squared break-out area, multiple training rooms and administrative offices to accommodate all liquid coating businesses.

The extensive project involved the construction of two mezzanine floors above the meet and greet area and in the plant area to house AC units.

An innovative, operable wall was supplied and installed in order to divide the two meeting rooms along with suspended ceilings needed to comply with building regulations and partitioning needed to create various spaces.

Key features

  • 140 metres squared break-out area, multiple training rooms & administrative offices
  • Two mezzanine floors above the meet & greet area and in the plant area to house AC units
  • Installation of an innovative, operable wall to divide meeting rooms along with suspended ceilings & partitioning to create various spaces
1
2
3
1

Showroom lighting

2

Furniture

3

Tea point

It was a pleasure to work with SEC Interiors.
We are very pleased with the final result which
SEC Interiors helped to deliver on time and
within budget.

Michael McInnesTechnical Manager
PreviousNext
Back to main projects

View other projects

TrustFord (Ford Retail Ltd)

The Internet Group Ltd

ETC (Electronic Theatre Controls)

Transcend

Our links

About us

Contact us

SEC Careers

 

 

Legal

Terms & Conditions

Privacy & Cookies

Health & Safety

 

Locations

Aylesbury | Bedford  | Cambridge

London | Luton | Milton Keynes

Northampton | Oxford | St. Albans

Stevenage | Watford

 

 

 

Our Office Hours

Monday – Friday: 9am – 5:30pm

SEC Group
Unit 11 The iO Centre, Whittle Way
Arlington Business Park
Stevenage
Hertfordshire
SG1 2BD

© Copyright - SEC Interiors 2020
  • Terms of Service
  • Legal notice
Franke Coffee Adapt UK Ltd
Scroll to top