Suspended ceilings were installed in designated areas, along with exposed electrical and mechanical installations, including a HVAC system complete with climate control. SEC sourced, delivered, and installed a variety of furnishings, including desking complete with screen dividers, one side pinnable – the other a white board. An assortment of storage units were also installed: mobile pedestals and drawer cabinets, along with a large board room table which was fitted in the conference room.
A new tea-point was installed on the first floor, with a breakout area bench for staff to enjoy a time-out break. The kitchen installation was complete with all necessary fixtures, integrated appliances and vinyl flooring to finish.