The entire office was then refurbished with new flooring, decoration and lighting and electrical works. High specification cantilever office desks with a walnut melamine finish and a white painted base were supplied and installed to the main office zone along with a mixture of full height and standard sized storage cupboards. A kitchen tea-point unit was also installed, complete with integrated appliances to finish.
The resulting works have provided Transcend with a complete turnkey solution in the form of a CAT B office fit-out, ready for Transcend’s specified move-in date.